Construction Management Services for the Advanced Water Purification Facility and Product Water Pump Station Project
Pre-Proposal Meeting: Monday, May 22, 2017, 10:00 AM
Proposal Due Date: Monday, June 19, 2017, 2:30 PM
Project Manager: Yohana Vargas, yohana@mrwpca.com, (831) 645-4605
Project Details (PDF): N/A
Project Documents (offsite): View or Download
MRWPCA is seeking proposals from qualified firms to provide Construction Management Services for the Advanced Water Purification Facility and Product Water Pump Station Project.  The qualified firm will provide construction management services using our Construction Management Software Procore (www.procore.com), and inspection services during construction of this project. 
 
The Project will be funded by the following funding sources: Clean Water State Revolving Fund (SRF) and Proposition 1 Recycled Water Grant Program (Proposition 1)


The Request for Proposal will be available for download via the MRWPCA’s online procurement system (www.procore.com).  To access the proposal Documents, please contact Yohana Vargas at Yohana@mrwpca.com for a free account to access ProCore.

View or download RFP documents
Design Services for Salinas Industrial Wastewater and Storm Water Storage and Recovery
Pre-Proposal Meeting: Monday, February 6, 2017, 1:00 PM
Proposal Due Date: Tuesday, February 28, 2017, 2:00 PM
Project Manager: Alison Imamura, alison@mrwpca.com, (831) 883-6176
Project Details (PDF): N/A
Project Documents (offsite): View or Download
MRWPCA is seeking qualified firms to provide engineering design services for the Salinas Industrial Wastewater and Storm Water Storage and Recovery Project located near Salinas, California. The project would include new wet wells, valve boxes, pipelines, and a new return pump station at the Salinas Industrial Wastewater Treatment Facility on Davis Road near the Salinas River south of the City of Seaside. In addition, an existing, abandoned industrial wastewater pipeline is proposed to be slip-lined to convey water from the Salinas Industrial Wastewater Treatment Facility to the Salinas Pump Station.

The Project will be funded by the following funding sources: Clean Water State Revolving Fund (SRF) and Proposition 1 Stormwater Grant (Proposition 1).
Annual Maintenance – SVRP Chlorination System
Pre-Proposal Meeting: N/A
Proposal Due Date: Tuesday, October 11, 2016, 3:00 PM
Project Manager: James Dix, jamesd@mrwpca.com, (831) 372-3367
Project Details (PDF): N/A
Project Documents (offsite): View or Download
NOTICE: INVITING PROPOSALS FOR Annual Maintenance – SVRP Chlorination System. The system consists of Liquid Chlorine Evaporators, Chlorinators, Chlorine Injection, Chlorine Gas Scrubber and associated conveyance and safety systems.   The tentative start of annual maintenance is expected to be November 15, 2016 with a scheduled completion date of January 15, 2016.

Bid submission deadline: 3:00 p.m., October 11, 2016
MRWPCA Pump Station & Conveyance System Condition Optimization Analysis Project
Pre-Proposal Meeting: Tuesday, July 19, 2016, 10:00 AM
Proposal Due Date: Friday, August 19, 2016, 5:00 PM
Project Manager: Jennifer Gonzalez, jennifer@mrwpca.com, (831) 883-6172
Project Details (PDF): N/A
Project Documents (offsite): N/A
MRWPCA is seeking qualified firms to develop a Master Plan for the Agency's ten pump stations. The purpose of the study is to develop a Master Plan for all facilities outside the boundaries of Regional Treatment Plant existing and planned. The Master Plan will include flow monitoring, hydraulic modeling, analysis of system condition, and preparation of a capital improvement program. This project is scheduled to be awarded at the October 31, 2016 Board Meeting.

Unless otherwise indicated, pre-bid meetings are held at the Regional Treatment Plant (14811 Del Monte Boulevard, Marina).

Bids are publically open via the electronic bid management systems. Bidders may attend the opening at MRWPCA Administrative Office, 5 Harris Court, Bldg. D, Monterey, CA 93940. Please contact the project manager for directions if needed.

Contact the identified Project Manager for specific project information.

CP291 Primary Clarifier No. 5 Cleanouts Project
Pre-Bid Meeting: Thursday, June 29, 2017, 10:00 AM
Bid Due Date: Tuesday, July 25, 2017, 2:00 PM
Project Manager: Jerry Valladao, jerry@mrwpca.com, 831-883-6179
Project Details (PDF): N/A
Project Documents (offsite): N/A
Work comprises of installing cleanouts on three 6-inch primary sludge lines.  The work includes, but is not limited to the following:  excavation, dewatering, shoring, removing and installing new piping, valves, and cleanouts, valve box riser, valve box, valve stem extension, backfilling, etc.

SECURING BID DOCUMENTS:  All bid documents, plans and specifications will be available for download via the MRWPCA’s online bidding system (www.procore.com).  To access the Contract Documents, bidders must contact Jerry Valladao at jerry@mrwpca.com for a free account to access Procore.
 
Advanced Water Purification Facility and Product Water Pump Station Project
Pre-Bid Meeting: Wednesday, May 31, 2017, 10:00 AM
Bid Due Date: Thursday, June 29, 2017, 3:00 PM
Project Manager: Yohana Vargas, yohana@mrwpca.com, 831-883-6182
Project Details (PDF): N/A
Project Documents (offsite): View or Download
The Project work covered by the Contract Documents includes construction, testing and startup of a 4-million gallon per day capacity Advanced Water Purification Facility (AWPF) and Product Water Pump Station. The work includes the following major components, including but not limited to:
Construction of a below-grade source water diversion manhole on the existing RTP effluent pipeline.
Construction of a below-grade source water pump station for conveyance of secondary effluent to the AWPF.
Construction of liquid oxygen and ozone facilities.
Construction of membrane filtration (MF) facilities.
Construction of reverse osmosis (RO) facilities.
Construction of ultraviolet light and advanced oxidation process (UV-AOP) facilities.
Construction of above-grade welded steel MF Feed and MF Filtrate Storage Tanks
Construction of four pre-engineered metal buildings to house the Ozone, Membrane- AOP, Chemical and electrical equipment.
Construction of post-treatment decarbonator and liquid lime stabilization facilities.
Construction of a below-grade product water pump station (PWPS) to pump the purified product water to a purified water reservoir located offsite.
Construction of product water pipeline from the PWPS to the connection point on the
Product Water Conveyance Pipeline.
Construction of a waste equalization pump station for collection and neutralization of process residual wastes and return to the head of the RTP.
Construction of a Medium Voltage (21KV) Switchgear for connection to PG&E, two transformers, and two Low Voltage (480 V)  Switchgear, associated 480 volt  motor control centers, variable frequency drives, wiring, conduit, power poles and associated equipment and controls to power the AWPF and PWPS project from the PG&E primary service.
Construction of a Medium Voltage (21KV) power system from the adjacent Monterey Regional Waste Management District (WMD) Co-Generation Facility over to, and connecting to the AWPF Medium Voltage system.  Note that this item is a separate Bid Item with an initial placeholder allowance. The final design for this item will be provided during construction and an RFQ will be issued for this work.
Instrumentation, controls, PLC and SCADA programming for the AWPF project, including incorporating the PLC programming prepared by the pre-procured equipment Suppliers into the overall AWPF project PLC and SCADA Controls system.
Facility startup, testing, and training.
Construction of all other associated demolition, site work, utilities, yard piping, electrical work, painting, landscaping.
Monterey Pump Station Wet Well Cleaning Project
Pre-Bid Meeting: Thursday, May 4, 2017, 9:00 AM
Bid Due Date: Wednesday, May 10, 2017, 2:00 PM
Project Manager: Dan Deeth, dand@mrwpca.com, (831) 645-4612
Project Details (PDF): View or Download
Project Documents (offsite): N/A
This work requires the removal of grease and grit material from the wet well and cleaning of all interior surfaces.

There will be a mandatory pre-bid site walk on Thursday, May 4, 2017, at 9; 00 a.m. at the Regional Treatment Plant followed by site visits.

Bid closing 2:00 p.m., May 10, 2017.
.
Seaside Pump Station Wet Well Cleaning Project
Pre-Bid Meeting: Thursday, May 4, 2017, 9:00 AM
Bid Due Date: Wednesday, May 10, 2017, 2:00 PM
Project Manager: Dan Deeth, dand@mrwpca.com, (831) 645-4612
Project Details (PDF): View or Download
Project Documents (offsite): N/A
This work requires the removal of grease and grit material from the wet well and cleaning of all interior surfaces.

There will be a mandatory pre-bid site walk on Thursday, May 4, 2017, at 9; 00 a.m. at the Regional Treatment Plant followed by site visits.

Bid closing 2:00 p.m., May 10, 2017.
Pump Station 13 Valve Replacement and Upgrades Project
This project includes mechanical and electrical upgrades to increase the pump station's reliability and to further protect the Monterey Bay National Marine Sanctuary. The project is currently being designed by V.W. Housen & Associates. Construction is expected to begin in April 2017.
Pre-Bid Conference/Public Workshop for the Advanced Water Purification Facility and Product Water Pump Station Project
Summary of Work: The Project work covered by the Project includes construction, testing and startup of a 4 million-gallon-per-day (mgd) capacity Advanced Water Purification Facility (AWPF) and Product Water Pump Station.
The Project will be funded by the following funding sources: Clean Water State Revolving Fund (SRF) and Proposition 1 Recycled Water Program (Prop 1) Grant.  Bids must comply with all requirements associated with these funding sources, including, but not limited to, USEPA DBE compliance and American Iron and Steel. 

Pre-Bid Conference
Staff of the Monterey Regional Water Pollution Control Agency will hold a pre-bid conference / public workshop on this project. Participation in this public meeting is optional but encouraged.

The public meeting will be held at the date, time, and location listed below. Please contact Yohana Vargas at Yohana@mrwpca.com with any questions.
May 9, 2017
10:00 am
MRWPCA (RTP)
14811, Del Monte Blvd,
Marina, CA 93933
Telephone: 831-883-1118
 
Participation Over Internet Via Webinar Teleconferencing System
Audio and presentations from the public workshop will be webcast over the Internet via Intercall, online teleconferencing system.

Please be aware that the meeting's Webinar audio and on-screen activity may be recorded.
Webinar information can be found at: https://sway.com/f0KROmqZCcYjyMW3

SECURING BID DOCUMENTS:  All bid documents, plans and specifications will be available for download via the MRWPCA’s online bidding system (www.procore.com) on May 15, 2017.  To access the Contract Documents, bidders must contact Yohana Vargas at Yohana@mrwpca.com for a free account to access ProCore.