Project Bids
Projects currently out to bid are shown below. As they become available, bid summaries may be accessed by clicking the link to the right of a project name.
Contact the identified Project Manager for specific project information and bid documents.
Unless otherwise indicated, prebid meetings are held at the Regional Treatment Plant (14811 Del Monte Boulevard, Marina); bid openings are held at the Agency’s Administrative Offices (5 Harris Court, Bldg D, Monterey). Please contact the project manager for directions if needed.
| Primary Clarifier Pump Pit Roof Replacement |
Bid Summary |
| The Primary Clarifier Pump Pit is a sunken structure between Clarifiers 1 through 4 which contains several sludge pumps and other equipment. Originally the pump pit had a roof to protect the equipment from exposure due to the elements. The previous roof structure has since been removed due to corrosion.
The Primary Clarifier Pump Pit Roof Replacement project consists of installation of a new protective roof structure. The new metal roof decking and structural framing will be painted with a corrosion resistant coating system. The new roof will also have removable transluscent hatches to allow for equipment removal.
|
|
Pre-Bid Meeting: April 26, 2012 @ 10 AM |
|
| Bid Opening: May 16, 2012 @ 2 PM |
|
| Project Manager: Tom Kouretas |
|
| Email and Phone: tomkouretas@mrwpca.com 831-883-6178 |
|
| Fire Alarm System Upgrades Project |
Bid Summary |
| The design and upgrade of the fire alarm system at the Regional Treatment Plant to meet or exceed the requirements of NFPA 72. |
|
Pre-Bid Meeting: MANDATORY 4/11/12 at 10 am at the Regional Treatment Plant (14811 Del Monte Blvd., Marina) |
|
| Bid Opening: 5/2/12 at 2 pm at the Regional Treatment Plant (14811 Del Monte Blvd., Marina) |
|
| Project Manager: Jerry Valladao |
|
| Email and Phone: jerry@mrwpca.com 831-883-6179 |
|
| Castroville Pump Station Influent Manhole and Sluice Gate Vault Structure Rehabilitation Project |
Bid Summary |
| Rehabilitation of the influent manhole and sluice gate vault structure at Castroville Pump Station which includes, but is not limited to, the following: bypass pumping, repair to the concrete structures (hydroblasting or abrasive blasting the surface, resurfacing, and coating the structures), coating of steel and cast iron items including the sluice gate, replacement of the sluice gate operator, and miscellaneous demolition work. |
|
Pre-Bid Meeting: MANDATORY 4/18/12 at 10 am at the Regional Treatment Plant (14811 Del Monte Blvd., Marina) |
|
| Bid Opening: 5/8/12 at 2 pm at the Regional Treatment Plant (14811 Del Monte Blvd., Marina) |
|
| Project Manager: Jerry Valladao |
|
| Email and Phone: jerry@mrwpca.com 831-883-6179 |
|
| Facility Upgrades – Biofloc Aeration System and Digester Mixing System |
Bid Summary |
| The work includes upgrading the Biofloc Aeration System and Digester Mixing System and includes the following:
- Demolition of existing blowers and membrane ceramic diffusers including headers, laterals, pipe supports, etc. Installation of new high-speed turbo blowers, tubular membrane fine bubble aeration diffusers, associated piping, instrumentation, and electrical work.
- Demolition of existing digester gas mixing and gas bubbler systems. Installation of new digester pump mixing systems, plunger pump, and radar level measurement instruments, replacement of the digester gas meters, and modification of pressure relief valves and flame arrestors on the digester tanks.
|
|
Pre-Bid Meeting: MANDATORY 4/17/12 at 10 am at the Regional Treatment Plant (14811 Del Monte Blvd., Marina) |
|
| Bid Opening: 5/10/12 at 1 pm at the MRWPCA Administrative Offices (5 Harris Court, Bldg. D, Monterey, California, 93940) |
|
| Project Manager: Jerry Valladao & Tom Kouretas |
|
| Email and Phone: jerry@mrwpca.com or tomkouretas@mrwpca.com 831-883-6179 or 831-883-6178 |
|
| Digester Gas Project |
Bid Summary |
| The work includes replacement of a portion of digester gas high pressure piping, and replacement of digester pressure control valves at the digester gas flares. |
|
Pre-Bid Meeting: MANDATORY- Tuesday, 4/24/12 @ 10 AM at the Regional Treatment Plant (14811 Del Monte Blvd, Marina CA 93933) |
|
| Bid Opening: Wednesday, 5/10/12 @ 2 pm at the MRWPCA Administrative Offices (5 Harris Court, Bldg D, Monterey CA 93940) |
|
| Project Manager: Jennifer Gonzalez |
|
| Email and Phone: jennifer@mrwpca.com 831-883-6172 |
|
| Agency Pump Station Breaker Testing |
Bid Summary |
| The work will involve the shutdown of 6 agency pump stations so that testing and preventive maintenance can be performed on the main breakers, emergency generator breakers and automatic transfer switches. |
|
Pre-Bid Meeting: OPTIONAL 03/06/2012 at 9 am at the MRWPCA Seaside Pump Station (1 Bay Street, Sand City, CA 93955) |
|
| Bid Opening: 03/13/2012 at 2 pm at the MRWPCA Regional Treatment Plant (14811 Del Monte Blvd, Marina, CA 93933) |
|
| Project Manager: Chris Foley |
|
| Email and Phone: chris@mrwpca.com (831) 883-6118 |
|
|
|